1. Pre-work & Safety Preparation
1.1 Lockout-Tagout (LOTO)
- Stop the crusher completely, cut off the main power supply, hang warning lock and tag.
- Release the hydraulic pressure if fitted with hydraulic adjustment / hydraulic clearing system.
- Wait until the machine cools down; hot parts may cause burns.
- Clear residual materials inside the crushing cavity with dedicated tools, never use hands.
- Prepare protective gear: safety helmet, anti-cut gloves, safety shoes, goggles.
1.2 Tools & Spare Parts Ready
- Torque wrench, slings, hoist, pry bar, oil pump, cleaning brush, kerosene / cleaning agent, rag, feeler gauge, caliper.
- Prepare spare parts: toggle plate, toggle seat, jaw plate, liner, bearing, sealing ring, bolts, grease.
- Record form: take photos of original assembly state before disassembly for reference.
2. Disassembly Sequence (Follow the order strictly)
Note: Do not force prying or hammering on casting surfaces to avoid crack.
- Remove feed hopper guard, side safety guards and drive belt guard.
- Unload V-belts, separate flywheel and pulley from the eccentric shaft end.
- Discharge all lubricating grease from lubrication points and oil tank.
- Remove toggle plate tension spring and tie rod assembly.
- Take out toggle plate first (toggle plate is the safety part; take it out before moving jaw).
- Disconnect the toggle seat from frame.
- Lift the movable jaw assembly carefully with hoist.
- Remove jaw plates (fixed jaw plate + movable jaw plate, check wedge blocks).
- Disassemble eccentric shaft bearing end caps, then pull out eccentric shaft and bearings.
- Take out frame inner side liners for inspection.
3. Item-by-item Inspection Standard
3.1 Jaw Plates & Side Liners
- Check wear depth: When tooth height wears down by 2/3, or local deep groove, crack, breakage appears, replace.
- Check fastening wedges and bolts: loose, deformed, cracked bolts must be replaced.
- Check contact surface between liner and frame: no gap, no erosion pit.
3.2 Toggle Plate & Toggle Seat
- Check for hidden cracks, abrasion on contact surface. Minor wear can be surfacing repaired; crack → direct replacement.
- Check toggle seat contact surface flatness; if uneven, grind or replace.
3.3 Movable Jaw Assembly & Bearings
- Movable jaw body: check casting crack at bearing housing, ear position.
- Bearings: check clearance, pitting, noise, heating, rust. Measure bearing clearance; exceed limit → replace.
- Bearing seals: aging, hardening, oil leakage → replace oil seal.
3.4 Eccentric Shaft
- Check shaft journal surface: scratch, wear, oval deformation. Light scratch can be polished; serious wear needs surfacing repair or shaft replacement.
- Check thread part for sliding wire and deformation.
3.5 Spring, Tie Rod & Adjusting Wedge
- Tension spring: fatigue deformation, crack, broken → replace. Spring elasticity failure will lead to unstable running.
- Tie rod: check thread and rod body bending, crack.
- Discharge gap adjusting mechanism: check adjusting wedge tooth wear, jam.
3.6 Frame & Foundation
- Frame: focus on welding position, bearing pedestal, side wall for fatigue crack.
- Anchor bolts: check elongation and looseness, retorque as required.
3.7 Lubrication Components
- Oil pipe, oil nozzle, oil passage: clean blockage, check oil pipe rupture.
- Check oil filter, oil cooler if equipped.
4. Cleaning & Repair before Reassembly
- Clean all oil passages, bearing chambers, contact surfaces thoroughly with cleaning agent, blow dry with compressed air.
- Polish slight burrs and scratches on mating surfaces.
- Repair small surface wear by hard surfacing (follow welding procedure for crusher cast steel).
- Discard any cracked castings directly; do not weld repair for load-bearing cracks.
5. Reassembly Key Points
Reassemble in reverse order of disassembly, focus on these rules:
- All mating surfaces evenly coated with specified grease before assembly.
- Bearing installation: control interference, do not knock bearing roller directly.
- Jaw plate installation: ensure uniform compression of wedge blocks, locking bolts tightened to specified torque.
- Toggle plate must sit fully on both toggle seats, no offset.
- Tension spring pre-tightening force: adjust according to manufacturer’s parameter, not too tight or too loose.
- Adjust the discharge opening to the required gap, use feeler gauge to verify.
- After all assembly, manually turn flywheel 2–3 circles, confirm no jamming, no friction.
6. Post-assembly Test Run
- No-load test run: 30 min. Check vibration, temperature of bearings (bearing temperature rise ≤35℃, max temperature <70℃), oil leakage, abnormal noise.
- Load test run: gradual feeding, run 2h. Check current, discharging size, fastening status of all parts.
- Fill in inspection record: wear data, replaced parts, torque value, test run condition.
7. Inspection Cycle Reference
- Small jaw crusher: Minor disassembly inspection every 1500 working hours; full disassembly inspection every 6000 working hours.
- Heavy-duty / high-hardness stone crushing: shorten cycle to 1000h for minor inspection, 4000h for full disassembly.
8. Common Pitfalls Warning
❌ Do not disassemble under pressure or power-on state ❌ Do not reuse cracked toggle plate ❌ Do not mix different grease types ❌ Do not omit LOTO procedure for quick inspection ❌ Do not over-tighten jaw plate bolts to crush jaw plate